Angola Egg Production & Pullet Cage Project

2024-12-07

The Angola premium egg-laying + brooder cage project, the first phase of 1 building with 4 rows and 5 floors of egg-laying houses + 1 building with 4 rows and 4 floors of brooder houses entered the site on November 16, 2020. After 80 days of intensive construction, all houses have been put into production and delivered. Currently, the two houses are in stable and orderly production and operation. The second phase of 5 egg-laying houses + 1 brooder house project is being prepared in full swing. As a supplier of equipment and design, Big Herdsman provided all equipment for the project, including environmental control systems, feed line systems, water line systems, egg collection systems, etc.

      

Big Herdsman is committed to meeting the special needs of customers and bringing unique benefits to customers. Adhering to the design concept of adapting measures to local conditions, it has made reasonable site planning to cope with the narrow and long plots of customers, which not only ensures biological safety and facilitates production, but also achieves a relatively large breeding volume and a reasonable ratio of brooder and egg production. In addition, according to the local climatic conditions, a targeted wind speed design was formulated, and the tailor-made project design was highly praised by customers.

     

Han Jiaxi, a project engineer of Big Herdsman, bravely took on the responsibility during the epidemic and rushed to Angola to provide installation guidance. During the equipment installation process, Han strictly followed the company’s installation requirements and quality standards, and the high-quality installation effect was well received by customers.

The Angola boutique egg-laying + brooder cage project is another benchmark set by Big Herdsman overseas. Big Herdsman has always provided the best solutions for customers at home and abroad with high-quality product quality and caring service attitude.